Skip to content
KYNT-AM
    • Homepage
HM Exploration Commences Borehole & Surface EM Surveys at Lewis Pilley’s

Author: HM Exploration

Posted Date:

August 17, 2026
  • HM Exploration Commences Borehole & Surface EM Surveys at Lewis Pilley’s

    HM Exploration
    August 17, 2026
  • HM Exploration Drills 18.45 Metres of 1.14% Cu, 2.42 % Zn, 16.74 g/t Ag and 0.32 g/t Au in Upper Lens; 5.42m of 1.99% Cu, 1.66% Zn, 15.39g/t Ag and 0.8g/t Au in Lower lens at Lewis Pilley’s

    HM Exploration
    August 4, 2026
  • HM Exploration Commences Optical & Acoustic Televiewer Program at the Lewis Pilley’s Project

    HM Exploration
    July 24, 2026
  • HM Exploration Confirms Significant Mineralization at Lewis Pilley’s Project; Intersects 23 Metres of 1.2% Cu, 1.7% Zn, 10.7 g/t Ag and 0.25 g/t Au

    HM Exploration
    July 21, 2026
  • HM Exploration Expands Newly Discovered Blind Massive Sulphide Lens at Lewis Pilley’s Project

    HM Exploration
    July 7, 2026
  • HM Exploration Discovers New Blind Massive Sulphide Lens at Lewis Pilley’s Project

    HM Exploration
    June 29, 2026